This project will bring nine beautifully designed suites and exceptional communal spaces, setting a new benchmark for modern shared living in Cambridge.
The property is located on Burgon Street a pretty alleyway located off Carter Lane just south of Ludgate Hill in the heart of the City of London close to St. Paul’s Cathedral and the River Thames. The property consists of a 4-storey former warehouse building arranged over basement, ground and three upper floors.
Dukes Hotel have employed VMA Construction to manage the refurbishment of 91 bathrooms within a live hotel operations at the DUKES Hotel, as part of a wider renovation before the hotel reopens in Spring 2026.
VMA Construction were employed by Fortius Clinic to create a Corridor with platform Lift from Level 3 in Bentinck Street to Level 2 In Wigmore Street so that staff and patients can transfer freely between their 2 facilities.
At VMA Construction Group we have a multi-disciplined Production Management Team with the skills and resources required to deliver a wide range of services for all aspects of your projects.
+44 (0)1727 634620
VMA Construction Group
16 St Johns Road, Farringdon. EC1M 4BS
© 2025 VMA Construction Group. All rights reserved.
We use cookies to improve your experience on our site. By using our site, you consent to cookies.
Manage your cookie preferences below:
Essential cookies enable basic functions and are necessary for the proper function of the website.
These cookies are needed for adding comments on this website.
Marketing cookies are used to follow visitors to websites. The intention is to show ads that are relevant and engaging to the individual user.
Google Maps is a web mapping service providing satellite imagery, real-time navigation, and location-based information.
Service URL: policies.google.com