Projects

VMA Construction Group

On going projects

18-Upper-Gwydir-Street-Babouris-Real-Estate
2025

Upper Gwyder Street, Cambridge

This project will bring nine beautifully designed suites and exceptional communal spaces, setting a new benchmark for modern shared living in Cambridge.

2025

Burgon House, London EC4V

The property is located on Burgon Street a pretty alleyway located off Carter Lane just south of Ludgate Hill in the heart of the City of London close to St. Paul’s Cathedral and the River Thames. The property consists of a 4-storey former warehouse building arranged over basement, ground and three upper floors.

2025

Dukes Hotel, London

Dukes Hotel have employed VMA Construction to manage the refurbishment of 91 bathrooms within a live hotel operations at the DUKES Hotel, as part of a wider renovation before the hotel reopens in Spring 2026.

2025

Fortius Clinic, London W1U

VMA Construction were employed by Fortius Clinic to create a Corridor with platform Lift from Level 3 in Bentinck Street to Level 2 In Wigmore Street so that staff and patients can transfer freely between their 2 facilities.

Enquiries

At VMA Construction Group we have a multi-disciplined Production Management Team with the skills and resources required to deliver a wide range of services for all aspects of your projects.

Construction through collaboration

Contact us

+44 (0)1727 634620

VMA Construction Group
16 St Johns Road, Farringdon. EC1M 4BS

© 2025 VMA Construction Group. All rights reserved.